Flagship engagement
Route performance review
A three-to-four-week look at one depot’s finished rounds: delay minutes by hour, missed delivery windows, and mileage against the planned sheet, then a briefing on the yard.
Who it is for
Operators running van or rigid rounds from a UK depot, typically eight to eighty vehicles, who already keep manifests and want a readable picture of where minutes disappear.
What you leave with
A bound set of charts and a written note naming roads, postcode sectors, and loading-bay bottlenecks. The depot manager leaves the briefing able to change start times, split a round, or speak to a retailer with evidence rather than anecdotes.
Scope
One depot or one named contract. Two consecutive weeks of completed rounds. Ride-alongs on two ordinary days, not a showcase day.
Included
- Delay-minute charts by hour of day and by round
- A table of missed windows with the actual arrival, not the planned one
- Mileage compared with the planned sheet, including empty running after the last drop
- A half-day briefing with the depot manager and the planner who builds the sheets
- A short note the operations director can send upstairs without rewriting
Not included
- Live screens in the cab or a login for drivers
- Disciplinary files or individual driver scoring for HR
- Rewriting retailer service-level agreements
- Hazardous-only or cash-in-transit fleets
Order of work
-
Intake call
We confirm which depot, which contract, and which two weeks. You name a contact who can walk the yard.
-
Manifest request
Completed round sheets, planned mileage, and GPS traces if you already store them. We work with paper sheets if that is what the depot uses.
-
Yard days
Two ordinary operating days: gate times, bay congestion, the moment the first van actually leaves, not the time printed on the sheet.
-
Charts
Delay minutes, missed windows, and mileage drawn as charts a planner can pin above the desk.
-
Briefing
We walk the findings on site and leave a printed pack. Follow-up questions by email for ten working days.